  1. metalhoosier

    Differentiate between 15-5PH and 17-4PH

    Metengr, The alloy analyzer was able to pickup the Ni, Cu etc. and the alloying ranges fell into the overlap of the 15-5 and 17-4 material chemistry ranges. Hardness was not helpful either. Is there any tell tale etchant I can use? Thank you, Metalhoo
  2. metalhoosier

    Differentiate between 15-5PH and 17-4PH

    What is the best way to differentiate between 17-4PH and 15-5PH material? My arc/spark machine results say the Cr content is lower than 17-4 range in the 15-5 Cr content range. Is there an appreciable difference in the amount of ferrite in 15-5 verses 17-4? What etchant will best show this...
  3. metalhoosier

    B16 equivalent in plate?

    Can anyone suggest a plate specification that meets the requirements for B16 material? Thank you, MetalHoo
  4. metalhoosier

    Conducting a Failure Investigation

    Metalman, In addition to the great suggestions above, I would highly recommend attending the ASM Metallography for Failure Analysis taught by Frauke Hogue. It is a hands on course that would directly answer your question. MetalHoo
  5. metalhoosier

    Possible Career Change to Quality Engineer

    My experience as a past QA/QC engineer has shown me that quality engineers are typically the first out the door during an economic downturn. Just my two Lincoln's, MetalHoo
  6. metalhoosier

    Inspection for carburization on 3XX Series stainless boiler tubes

    Ed, Thank you for your thoughts as well. We aren't experiencing much scale on the surface and the scale that is attached is very tenacious as observed in the attached photos. Looks as if a thorough visual and UT inspection is my only safety net besides tuning. With management extending run...
  7. metalhoosier

    Inspection for carburization on 3XX Series stainless boiler tubes

    metengr; I have observed both the bands of wastage and pock marks and those tubes will be removed from this particular SH. I am looking to go a step further, if possible, with a proactive, safe, macroetch approach that could identify areas where the marks and wastage had not yet initiated, but...
  8. metalhoosier

    Inspection for carburization on 3XX Series stainless boiler tubes

    Folks, Anyone know a quick visual method for determining carburization on 3XX SS boiler tubes (waiting for coal ash corrosion is too long). I anticipate we will sandblast several strips across the pendants and then use ??? (etchant) to determine the severity of carburization the pendant is...
  9. metalhoosier

    2.5" socket weld connections

    When the electric utlity plants I work with were built (60's, 70's, 80's), the original engineering construction firms, two different ones, used construction specifications that did not allow high pressure (2000-2900psi), high temperature (1005F) socket welding over 2". B16.11 is acceptable to...
  10. metalhoosier

    Is code case 2235-9 applicable to B31.1?

    Metengr, This is for a repair. Metalhoo
  11. metalhoosier

    Is code case 2235-9 applicable to B31.1?

    Can Code Case 2235-9 - Use of Ultrasonic Examination in Lieu of Radiography Section I; Section VIII‚ Divisions 1 and 2; and Section XII be used for B31.1 pressure piping? My first answer is obviously no based on the criteria called out in the title of the code case, however, a contracted NDE...
  12. metalhoosier

    Absorber tower repair with Alt PWHT

    Metengr, Thank you again for the feedback. Please understand my hesitancy to use this alt. PWHT. As stated in Part 3 2.5.3 b)"Competent technical advice shall be obtained from the manufacturer of the pressure- retaining item or from another qualified source, such advice being especially...
  13. metalhoosier

    Absorber tower repair with Alt PWHT

    Metengr, Thank you for the quick response. Are you aware of any research papers that have proven this Alternative PWHT method successful with amine solution using ASTM E837?
  14. metalhoosier

    Absorber tower repair with Alt PWHT

    I have an absorber tower where an MDEA amine solution is part of the process stream. Repair welding (fillet welds) is needed on the ASME pressure vessel. Almost every document I have researched instructs PWHT to be performed after repair welding. The material is 15/16" SA-212-B plate and the...
  15. metalhoosier

    Online NDE Training

    Does anyone have recommendations for a quality online NDE training program to satisfy MT and PT requirenments per SNT-TC-1A? We are investigating starting up our internal NDE program and sending multiple techs/ engineers to a training site is not an option. Thank you, Metalhoo
  16. metalhoosier

    2x Chromium in A532 using PMI

    metengr and arunmrao, I think you hit the nail on the head. I ASSUMED the surface of this material was prepared as it is in an abrasive slurry bath, and was visually a white metal finish, however, I should have taken some sandpaper in with me during this inspection. Won't make the mistake...
  17. metalhoosier

    2x Chromium in A532 using PMI

    Why do I obtain readings from a calibrated portable alloy analyzer (Xray tube) of 45-58% Cr for A532 (28G) material which should be 23-30% Cr? Is it due to the volume of carbides on the surface of the cast impeller part between the interdedritic structure? I have no way of verify the...
  18. metalhoosier

    1996 IX Code change

    Thank you both for the excellent info and background.
  19. metalhoosier

    1996 IX Code change

    metengr, What type of covered electrode do you purchase then to take the place of the B3L? 9018-B3? If so, have you noticed any issues with cracking? Metalhoo
  20. metalhoosier

    1996 IX Code change

    From what I am told, in 1996 some electrode mfg's went to the ASME code stating they could not meet the mechanical requirements for a E9018 and others could. So the code was changed stating that the E9018 can now be used and called an E8018. Well, the electrode suppliers who were able to meet...