  1. sahelrahman

    disconnecting means

    Hi Can anyone pls tell me if a 45kVA 480v-208v remote transformer require a disconnecting means? Thanks
  2. sahelrahman

    Salary for an Electrical engineer

    I wonder what is the salary of an electrical engineer with three years of experience (in Dallas,TX) in lighting and power.
  3. sahelrahman

    single line to ground fault

    Thanks everyone!! Hi dpc... I am using NFPA calculation. So is it going to change the arc flash. If not, why are we doing the single line to fault calculation?
  4. sahelrahman

    single line to ground fault

    While doing the arc flash study, I wonder what effect does the single line to ground fault has on arc flash current and incident energy? When I performed the arc flash study, I did a mistake of low resistance grounding the transformer and generator instead of solidly grounding them. There was...
  5. sahelrahman

    inrush current of pdu transfomers and inst. setting of ups breaker

    By UPS breakers, I mean both the breakers on the switchboard and the internal breakers. These ups has internal breakers with long time and instantaneous settings. So I wonder, what should be the inst. settings of both the breakers (internal breakers and the one on the swbd feeding ups) ? Thanks
  6. sahelrahman

    inrush current of pdu transfomers and inst. setting of ups breaker

    Hi, I am currently doing a coordination study and I would like to know how to set the UPS instantaneous setting. I know I have to calculate and add the inrush current of all the pdu transformers and set the instantaneous setting of the static bypass switch circuit breaker to a level where it can...
  7. sahelrahman

    ZSI for cutler hammer MDS C-32 breaker

    forgot to attach the drawinghttp://files.engineering.com/getfile.aspx?folder=2c77f4a1-be8b-43da-9fcb-633f8f6b29c9&file=SWGR.jpg
  8. sahelrahman

    ZSI for cutler hammer MDS C-32 breaker

    Hi I am currently working on the coordination study using SKM power tool analysis. Questions regarding the ZSI settings. The SKM support told me that I have to input the Trip/Delay time(sec) for the breakers with ZSI module. The manufacturer said that the minimum trip time is 0.1. Please have...
  9. sahelrahman

    Z462- Glove Class

    The following glove class table comes from ASTM D120-95 00 500V 0 1000V 1 7500V 2 17000V 3 26500V 4 36000V It is always good to include this in the appendix of the arc flash report.
  10. sahelrahman

    xfmr short circuit rating

    Is it true that the outdoor pad mounted transformer do not have a short circuit rating? Instead, manufacturers provide us with ansi damage curves..
  11. sahelrahman

    bracing rating

    Thank you guys for responding!!!
  12. sahelrahman

    bracing rating

    What is bus bracing rating?
  13. sahelrahman

    Vacuum fault interrupter

    Jghrist...Here is the one line diagram...Please have a look at the uploaded filehttp://files.engineering.com/getfile.aspx?folder=9d189a30-54ac-4b4d-815d-253710837b69&file=one_line.jpg
  14. sahelrahman

    Vacuum fault interrupter

    Thanks for responding.. jghirst- Yes the settings provide coordination with the transformer fuses. I don't have a good knowledge about the closed loop system and currently I am doing the coordination study using the SKM powertool analysis. My manager asked me to do this. So I am kind of...
  15. sahelrahman

    Vacuum fault interrupter

    There are two vista switchgears, one fed from A-side and the other one fed from B-side. These switchgears serves transformers. Since the B vista switchgear is energized through the closed loop switch in each transformer a fault on a primary conductor will be fed direct from the utility and...
  16. sahelrahman

    fuse

    sorry I gave wrong information. The current on the primary side of the transformer is approximately 42Amps
  17. sahelrahman

    fuse

    Hi, I am trying to select a S&C vista device. Downstream of this device is a fused transformer rated at 2500kVA, 34500kV/480V. The transformer fuse is rated at 8A. The current on the primary side of the transformer is only 5A. Can I select a vista fuse rated at 100A? Is it too high?
  18. sahelrahman

    Inverse definite time relay

    What is a inverse definite time relay? How does it work?
  19. sahelrahman

    protective devices

    It is a Vacuum fault interrupter.
  20. sahelrahman

    protective devices

    I have a question regarding the protective device voltage. The utility is 34.5kV and the relay connected to the S&C vista SWGR is rated at 23000V. I always thought that the protective device voltage should always be higher than the bus voltage. Please advise... Thanks