add a system feeder (axiom or similiar) and tie into expansion tank..provide a hose bibb connection adjacent to the system feeder to fill the system feeder tank .
This dust collector is a camfil 'lowboy' situated on a mezzanine over a small woodworking shop (used for training - no production). The shop will have all the standard woodworking equipment..table saws..planer..bandsaw etc. Is a dust conveyance system required to empty the collector dust bin...
Recently, a chiller plant we designed kept cutting out on high head pressure and were told it was a result of an incorrectly sized condesing unit. However when I looked back at site pictures from when the chiller was being charged I noticed the pressure gauge manifold had 'R410a' on it when the...
Im in a debate over indoor humidity levels. I believe a recirculating air system bringing in a percentage of outdoor ventilation air will have higher humidity levels compared to a 100% outdoor air system. The building is a high school in a remote location, very cold dry northern climate...
I am working on a building in Nunavut(very cold minus 50F design). Due to permafrost the buildings are built up on stilts. There is an insulated crawl space under the entire building. The client does not want in slab heating. The crawl space is heated with finned tube convector heaters. I am...
Chiller has two compressors: circuit A & circuit B, circuit A= 60 tons cooling, circuit B= 45 tons cooling. Chiller compressors have 8 steps of modulation capacity, if a few stages of modulation cut off of circuit B (by chiller representative) the chiller performance would be de-rated chiller...
During commissioning of a new modulating 105 ton screw chiller, the chiller kept tripping due to high head pressure. It was found that the condensing unit capacity of 105 tons was matched to the chiller without taking into consideration the added heat of compression (approx. 20 tons). There was...
Hi Guys, I have an application where the main air handling unit (constant volume) is providing slightly cool air (65 deg F) to both interior and exterior zones. Each zone has its own re-heat coil. The exterior zones also have a baseboard convector heater. I am unsure of the best way to sequence...