I am not in a position to sketch right now, so hopefully me elaborating will fill in the gaps. I'll ignore the floors. Let's say the automated block valve on suction is currently 15 ft above the pump. The change, for example, would leave the automated block valve 30 ft above the pump unless I...
Young engineer working on pump project. Pump suction/discharge is cleared with air at end of operation. I am looking at installing new pump down a level. I have option of moving automated block valve on suction to lower level or leaving where it is on upper level. It is a PD pump and running dry...