Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. jijoygopal

    Pipe schedule and Class

    Normally for PVC pipes also Classes are specified instead of Schedule. However general practice for CS ans SS pipes is to follow Schedule as per B36.10 and B36.19
  2. jijoygopal

    Weld overlay for flanges

    Hi I have a Low Temp (A350 LF2) RTJ flange which has requirement for weld overlay on flange face. My query is that 1) Can we deposit the weld overlay and then go for machining. in this case the gap between the two flanges will be increased by the weld overlay. Or is it general practice to...

Part and Inventory Search