  1. york83

    USE OF EXISTING PIPING WHEN CHANGING OUT AIR CONDITIONER AND AIR HANDLING UNIT

    Personally I would say replace the existing piping. Being that it is buried and going from a system with one type of oil to a system with a much different type of oil could cause problems in the future. Have contractor run new, clean ACR piping above ground if possible. More cost up front but...
  2. york83

    Variable primary chilled h2o loop

    I cannot clarify for you, but in my situation the building is only about 20' tall and I believe the expansion tank DOES have a bladder. The expansion tank is situated at ground level.
  3. york83

    Variable primary chilled h2o loop

    Thank you guys for the responses and links.. Be well..
  4. york83

    Variable primary chilled h2o loop

    Hey guys, I am new to the site and I am NOT a mechanical engineer (hopefully I am not violating any rules) but I would like to become one eventually. I currently work for a large HVAC mfgr. on the service end. Let me start by saying that hydronics are not my strong suit. I came upon a chilled...