Hi Everyone,
I would like to ask about progressive cavity pump rotor. Per my client specification it stated Rotating elements shall be balanced per ISO 1940-1 Grade G2.5 but Vendor takes an exception on this requirement due to the design of the equipment.
Is it necessary to balance the rotor...
Thanks for your reply but please explain regarding the formulas below.
Total Disch Head = hsd + hfd + hvd ± hpd
Where:
hsd = Discharge Static Head
hfd = Discharge Friction Head
hvd = Discharge Velocity Head
hpd = Discharge Pressure Head
Total Suction Head = hss – hfs + hvs ± hps
Where:
hss =...
Hi everyone. I wanna ask regarding friction head, why is it at total discharge head calculation the friction head is added while in total suction head calculation the friction head is subtracted?
Is it a right choice to select Plan 11 + Plan 53b flush plan for condensate process fluid without any caustic mixture? or do I have to select Plan 11 only.
As specified by my client, double seals shall be used with external flush (condensate) shall be used for process water and caustic...
According to API 675 section 2.1.15 it states that "Rated Capacity shall be at least 110 percent of the maximum capacity specified".
What does it mean?