That could be a good option. There is an opportunity to put a joint where we have a reveal in the form, I'll look into that. I'll probably also use ATSE's idea of the foam blockout.
All very helpful, thank you very much. I'll look into the mass pour resources posted. It's a small job for a parks department, so I'd like to be as specific as I can with what I want and leave as little as possible to the contractor. Sometimes the contractors they get for these small jobs...
I'm designing a concrete pedestal for a sculpture. The pedestal is mostly architectural in that it is structurally oversized to support the load. It is a 48"wide X 48" long X 90" tall (42" in the ground, 48" above ground) pedestal to support a 750 lb, 7' tall sculpture. Any advise on when to...