Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. onlinework

    LEED EQ 3.2 Building Flush

    Yes you have to continue until 14 days of continuous or scheduled flush is done prior to occupancy. Else CXA will not credit allocated LEED points for discontinuity. Idea of flushing is to ensure that "VOCs" due to materials and finishes does not exist during or after occupancy. As per the work...
  2. onlinework

    What is the total air changes per hour and minimum outdoor air changes per hour in the OTs?

    Dear HVAC Folks Im totally confused with the ambiguity reflected in ASHRAE Hospital Design std. I need perception by others over this topic.
  3. onlinework

    ASHRAE Hospital Design 100% Ingres & Egress of O.A

    Dear et al! According to ASHRAE Hospital design minimum outdoor air requirment for the healthcare fascilities. like ICU, 100% Outdoor air is recommended. Instead of All air exhausted to outdoor, it implies to Dash (-). What does it mean?. Is it optional to exhaust or recirculate with HEPA...

Part and Inventory Search