Thanks! Retained height above the dredge line is 14 ft. Soil is a 110 pcf granular material on the land side for the first 8 ft. of depth. after that it is a 105 pcf clay material down to 100+ ft. My question is: what are your thoughts on just cantilevering it? Intuitively I want to put a...
Good morning all! I have been lurking for a while and have rec'd plenty of support over the years. Here is my situation. I have an existing tied back timber bulkhead that is to remain, however, the owner wants to gain some space and construct a new sheet pile bulkhead on the water side of the...