Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: MrR1
  • Order by date
  1. MrR1

    LP Flare Header repair waiver PWHT

    georgeverghese, Process Design Prssure: 5 Barg. Max operating Pressure which was during operation: 4Bar in September-2012.
  2. MrR1

    LP Flare Header repair waiver PWHT

    We have corrosion localized to the bottom of the line mainly due to deposits along the bottom of line. We want to repair corroded Carbon Steel LP Flare Header by welding external lap-patches/plates to the bottom part of the header (only for significantly corroded straight run parts (5mm -...

Part and Inventory Search