I have two electric panels 3000 and 4000 amps. What would be the proper Arch Flash Labeling on these panels? This is a high rise commercial building and maintenance staff does not have the authority to open these panels. Thanks.
Folks,
I am investigating two types of products for commercial highrise buildings.
1. Coating steel beams with spray on fire retardant for small areas missing coating.
2. Filling holes in floors and walls where pipes protrude through this includes concrete and drywall.
Thanks
Folks,
Does anyone know of a NFPA or NEC code that pertains to an electric heater attached under a laminated desk? Further more a code for portable electric heaters in commercial building.
Thanks
I am working with a 21 story high rise and I would like to get an idea what should my system pressure be at the pump while sitting in the off position. I have been told many conflicting answers that confused me to say the least. If my setting PSI is ? what should the standpie PSI be on the 21st...