Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations SSS148 on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: SH43
  • Order by date
  1. SH43

    Tied-Back Earth Retaining Wall

    Thanks all for your replies: "ChipB", thanks for the references. I will go through them. "civilperson", the buildings will be designed for the tie force. "PEinc", the site will be undergoing significant earthwork for stabilizing soil including grouting and using geotextile. I have been given...
  2. SH43

    Tied-Back Earth Retaining Wall

    Yes, Please see the sketch attached.http://files.engineering.com/getfile.aspx?folder=ff077eec-6d62-42f0-970e-b5b5833ba74e&file=Sketch.bmp
  3. SH43

    Tied-Back Earth Retaining Wall

    Hi, I am designing a number of retaining walls. Some of them are as high as 9m (30ft). On the heel side, there are 3 or 4 storey buildings that give me the opportunity to tie-back the wall at top to the basement or ground floor slab. Rotation of bottom of the wall around the tie point is...

Part and Inventory Search