We have a 50 HP motor at 480 v that is serviced through a 100 amp CB and VFD controlled. It runs a large fan that exhausts fumes from one department into a Regenerative Thermal Oxidizer to "cook" off the fumes before they are released to the atmosphere. I got a call from the second shift...
All went well, had the power co. come down and de-energize the line side coming in. Threw the switch, made a visual inspection threw it back in and another inspection good to go. Will do this on a yearly basis in the future. The service was installed in 1977.
Thanks guys, I was going to shut off all of the circuit breakers in the panel first, but I think I will contact the power coompany in regards to "killing" the feed to the service also.