Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. caml17

    Caisson drilling on sloped bedrock profile

    Disclaimer: This is more construction than engineering question. I need to drill caissons with approx. 5m total depth. On site the conditions were found as per the picture, the caissons land right in the middle of a steep rock slope. Is there any drilling equipment or technique that would be...
  2. caml17

    concrete curing CSA 23.1 table 20 clarification?

    Any Canadians can clarify something from CSA code? A23.1 looking at table 20 for concrete curing. My question is, what is meant by 10'C? Is it the ambient temperature, concrete temperature, surface temperature, or what? "1 Basic curing 3 d at  10 °C or for the time necessary to attain 40% of...
  3. caml17

    Bridge shear pin / shear key grout strength required before post-tensioning

    shear pin is sika 212 HP shear keys are sika 212 thanks,
  4. caml17

    Bridge shear pin / shear key grout strength required before post-tensioning

    Is full strength required? Is there a typical % strength? (With source please) thanks,

Part and Inventory Search