Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Tek-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. Sinadi2003

    Two-Phase Separator Sizing - Hold up time criteria ....What's the concept behind it?

    Hi all; I am verifying the size of a two-phase separator (Gas/Liquid) vessel. There are two criteria which should be fulfilled. The terminal velocity in gas section and hold up time for liquid service. I am struggling with the hold up time or height difference in liquid levels between each...
Back
Top