Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: 4321g
  • Order by date
  1. 4321g

    Retaining wall near a river bank

    Hi, Sorry for the delay, i was carried way with something. Below are the explanation for you questions: . The information required includes borehole log, which will give you the sequence of the soil types,friction angle,unit weight and water level beneath the groung surface. . based on the...
  2. 4321g

    STRUT AND TIE METHOD

    The reason why i want used it is because I have Pile cap made up of three piles arranged in triangle which are link by steel beam that support logitidunal beam of a flatform.
  3. 4321g

    Retaining wall near a river bank

    Hi i would like to comment as follows: 1. first carry out geotechnical investigation to establish the soil profile and seepage pattern. 2. Conservatively,apply hydrstatic pressure on the wall facing the river side and provide drainage pass under the wall to avoid piping effect. 3. For economic...
  4. 4321g

    STRUT AND TIE METHOD

    Is it allowed to use strut and tie method to design structural steel beam?

Part and Inventory Search