Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. dewood1234

    afghanistan snow loads

    I am working on a structural design for a facility in Kabul. I am using the military's UFC Design Code (along with IBC and ASCE). Unfortunately, these references do not provide a design value for ground snow loads for this area. Any advice.
  2. dewood1234

    Bundling Rebar

    ACI 318 section 12.4 states that develpoment length for compression and tension for three bars bundles shall be increased 20%; four bar bundles 33%. there are other things to consider that section 7.6.6 talks about, one being staggering of the bundle terminations.
  3. dewood1234

    snow loads in afghanistan

    I am working on a structural design for a facility in Kabul. I am using the military's UFC Design Code (along with IBC and ASCE). Unfortunately, these references do not provide a design value for ground snow loads for this area. Any advice.

Part and Inventory Search