Background:
Client is suggesting CL900 ANSI piping from wellhead to midway into a control skid (throttling, switching valves, etc.) where the remaining piping would spec. break to CL600 ANSI. I should mention all the CL900 lines will be registered with ABSA (B31.3), as both the steam and...