I have a project where a proposed building location is on top of an existing sewer lateral from an existing facility. The proposed building location is between the existing facility and the main sanitary line. There is no room to move the proposed building. I recommended to relocate the existing...
I use a minimum of 2% slopes in gravel parking lots. My client wants to use 1% slopes due to the amount of fill that will need to be brought in from off-site. I explained the risks of using a slope less than 2% to the client, but he is willing to take the risks. Will I be liable when potholes...