Thank you for your reply.
I called a local structural engineer and got a similiar response...that the if the concrete was already able to bear load when the rain came then the water should actually help, not hurt the hydration process.
I spray painted a large screw driver tip and tried to...
On 5/28/03 3pm new footings were poured for my addition.
One hour later it poured and the forms were sitting in 1-7 inches of water.
By 6pm the contractor had it pumped out and the footing were just sitting in mud with some puddles on top of the footings.
This morning at 6 am I pumped out...