Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Tek-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: CSBud
  • Order by date
  1. CSBud

    COMPOSITE WRAP's for pipeline repair

    Clock Spring has a wet lay-up as well called Contour. I can highly recommend.
  2. CSBud

    Determining interlaminar shear on a composite wrap

    The technical specification - ISO 24817 has a formula that calculates this interlaminate stress based on pipe specifications and operating parameters. This is only hoop loading...
Back
Top