    Using slipform in tower construction

    Thank you hokie66 for your comments . The floors concrete casting have been monolithic with columns by installing pull out bars in the forms of columns . The reasons of using slip form ( for contractor) is the low cost of slip form in the area and the big dimensions of columns (about 80*220...
  2. mnsameti

    Using slipform in tower construction

    Hi everybody, I am supervisor of a reinforced concrete tower, the contractor uses slipform as formwork of all the vertical elements like shear walls, core walls and columns, it can not pour concrete more than one floor height in one time casting because of installing stirrups and other...
  3. mnsameti

    7 days concrete strength

    I think it is better you ask for taking at least 3 core , then after getting the cores test result you can decide better