I have a cabin 24' deep x 26' long with an older 3-1/4 x 14 glu-lam roof beam that runs the 26' length of the building. The two sides and the bottom of the beam are accessible, but the top surface is not. There is a "stepped" joint in the beam at a point approx. 10' from one end with a 4x4 post...