    Commercial wall mount air conditioner versus window units

    I specify HVAC equipment for utility buildings; they range in size from about 10 ft square to 15 ft X 30 ft with a 10 ft ceiling. The buildings may contain switchgear, pump motors, VFDs, and controls or sometimes nothing m0re than a pump and motor. I typically specify wall mount equipment...
  2. 71713

    Allowable B31.4 fitting material

    I just purchased ASME B31.4 as I am working on a small fuel handling system at a diesel-fired power plant. New aboveground storage tanks will be installed along with new piping. The plant maintenance department wants to use malleable iron fittings. Section 423.24(a) seems to be clear that...
  3. 71713

    Chlorine storage room ventilation

    Ten-States Standard requires 1 air change per minute when the room is occupied. This page also provides some guidelines http://www.deq.state.mi.us/documents/deq-wd-water-fos-tsu-SuggPracChlorineDesign.pdf I would expect the International Mechanical Code to specify some minimum ventilation...
  4. 71713

    Allowable wall thickness difference in gas pipe

    I am relocating a section of a natural gas transmission line. The existing pipe is 16" diameter with 1/4" wall thickness. Pipe with a 3/8" wall is available. Is there a maximum change in material thickness allowed in ASME B31.8 or Part 192 at a weld joint? Will this require a special weld...
  5. 71713

    Air receiver hydro test pressure

    Thanks. This allowed me to explain why the client needs to spend more money on the higher rated tank.
  6. 71713

    Air receiver hydro test pressure

    I've been told by a tank manufacturer that per code ASME stamped air receivers are to be tested at 1.3 times the maximum allowable working pressure. Is this correct or does the number vary depending upon size and pressure? I'm looking at steel air receivers in the 600-1200 gallon range with...
  7. 71713

    Leak testing field erected AST

    I'm looking at the inspection requirements in STI's SP001 for field erected aboveground storage tanks. The requirements include leak testing. Can someone explain the procedure(s) for leak testing old 80k-150k gallon diesel tanks?
  8. 71713

    Maximum air changes per hour

    This unit is 2500 kW and cooled thru use of a cooling tower. The engine and generator still dissipate a lot of heat into the room; therefore the need for significant airflow to minimize the temperature increase in the room. From a practical standpoint, at what number of air changes per hour is...
  9. 71713

    Maximum air changes per hour

    I have a large diesel generator located in a building and need to improve the ventilation. My calculation shows 49,000 cfm are needed for ventilation to maintain a 20 delta t in the room. This flow rate equals about 1 air change per minute. That seems like a large number to me. Is this...
  10. 71713

    Heat load from pump motors

    So even though the pump is in the room, because the liquid leaves the area, the driven equipment is considered "out of space". Correct?
  11. 71713

    Heat load from pump motors

    I have two 125 hp motors in a room that pump water outside the room to a clearwell. I want to know how much heat is dissipated to the room to size exhaust fans. After reading the recent thread about heat from conveyor motors (403-174079) it seems that the heat load to the room would be 785,494...