dear all,
I kindly request to all the specialyst, which are the process requirement in order to choose a REDUCING BORE or FULL BORE.
When I choose one respect the other.
Thanks and best Regards
Marcello
Dear all,
I kindly request to all the specialist if have put a battery limit between ASME 31.3 and 31.8 on BARRED TEE on pipeline configuration.
This is create a problem for difference of thickness and special spool is required.
In all the project I have seen a Battery limit at first flange...
Dear all, good day to everybody,
I kindly request to all the specialist a help on the following matter :
I have to do a HOT TAPPING on GAS pipeline existing 52" and 42".
As far as I understand, for HOT TAPPING in GAS LINE is required to do a BYPASS in order to cut and install a new piece.
In my...
Dear all, good night to everybody,
we have a case downstream christmas tree for oil production 8" 2500 rating where is required 10D of cladded pipe for chemical corrosion inhibitor injection.
After 10D of cladded material ( LTCS + 3 mm of ALLOY ) is request to change to Carbon steel 2500rating...