THANK YOU FOR YOUR REPLY....OUR TEMP WAS AROUND 40, TRUE FALL DAY IN BUFFALO AREA. SHOULD HAVE CURED NICE AND SLOW......I THINK IT CURED TOOOOOOOOOOO SLOW! THANKS AGAIN
THANKS FOR THE REPLY,
1) THE GARAGE WAS PUT UP BEFORE THE CONCRETE CONCRETE WAS POURED TO I DON'T KNOW HOW MUCH WATER WOULD HAVE BEEN DRAWN OUT.....I THOUGHT MAYBE THE SEALER CRACKED...THE FLOOR IS COVERED WITH TINY HAIRLINE SURFACE CRACKS.
2) THE CONTRACTOR TOLD ME THE SEALER TO BY...
CONTROL CRACK JOINTS WERE PUT IN, BUT NO CRACKS AT THOSE POINTS......NO TEST CYLINDERS TAKEN YET.....WE PROBABLY HAD A LIGHT FROST ONE DAY AFTER THE POUR WAS COMPLETED. SLAB IS 4" THICK. NO WATER WAS ADDED WHILE TROWELING. I HAVE NOTICED THAT THE GARAGE FLOOR HAS THE LIZARD SKIN LOOK...
I had a 12x25 concrete floating pad poured late october 2002. Also had floor poured in my pole barn at the same time.
I live in the buffalo ny area.
The pad butted up against an existing pad.
The contractor I had do it has been doing concrete jobs for 30 years, in business for himself.
Well, it...