Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. JSheehan

    Calculating yield during a bituminous paving operation

    While working for a paving contractor I used to use a factor 17.4 sy/ton/inch of asphalt. So for every ton of asphalt at one inch thick you place, you should cover approximately 17.4 sy, two inches is 8.7 sy and so on. This is an easy but crude way to calculate your yield for each truckload...
  2. JSheehan

    Need information on Biosparging.

    The wells range in depth from 200'-500'. It is impractical to excavate or turn the soil. The site was/is a heavy industrial manufacturing site. The contaminants are various fuel and machine oils. The soil is a very granular sandy soil so porosity should not be a problem. I am more...
  3. JSheehan

    Need information on Biosparging.

    Does anyone have any information on recent biospharging projects? I am bidding on a project and would like any information to familiarize myself with the procedure. Any help would be appreciated. Thank you.

Part and Inventory Search

Back
Top