Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. spudgunblunder

    VFD Under Voltage Fault

    @ RedSnake, Thanks yes I should have said code UV. I'm not use both VFDs at the same time. The Lathe VFD started playing up so then replaced it with the mill VFD. Both are playing up now so bought a new one which I switched over last night and works fine. @ edison123, I can't find any loose...
  2. spudgunblunder

    VFD Under Voltage Fault

    Hi all, I've had 2 single phase to 3 phase 2.2kw 10A VFDs for several years now with no issues. One on my lathe, one on a mill. Recently got an INTERMITTENT error of UU undervoltage (on both VFDs). It can run fine for ages then suddenly trip. Sometimes under load, sometimes not. Tried with...
  3. spudgunblunder

    Common Datum System of Rectangular Pattern of Holes

    Thanks pmarc, So the 4mm slot IS constrained to the theoretically exact line between the two 10mm holes? I think I correct to say this is confirmed by section 5.4.2 of BS EN ISO 5458:2018?
  4. spudgunblunder

    Common Datum System of Rectangular Pattern of Holes

    Hi all, Does the common datum system A (of 4 centres) control the slot to be symmetrically within a tolerance zone of 0.5mm along the TED line between the holes? Ref section 6.6.4 of BS 8888:2020 (not sure if I can upload screen shot?)

Part and Inventory Search

Back
Top