Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. Imheron

    Dowel bar length in seismic retrofit project

    I'm designing a seismic retrofitting project. Similar to the detail introduced in FEMA-172, an existing concrete frame will be infilled with a new shear-wall which attaches to the exist column on one side while keeps about 4 feet from another exist column on the other side. The spandrel beam is...
  2. Imheron

    dowel bars length in seismic retrofit project

    I'm designing a seismic retrofitting project. Similar to the detail introduced in FEMA-172, an existing concrete frame will be infilled with a new shear-wall which attaches to the exist column on one side while keeps about 4 feet from another exist column on the other side. The spandrel beam is...

Part and Inventory Search

Back
Top