hi dicksewerrat, this is the research of my first year in university to simulate a condition for tunneling works by means of pipe jacking method. from design to construction, the information as detailed as possible shall be made for this research. some reference recommend the preferable...
hi all, thanks for the fruitful hints. finally, much grateful if you could let me have your view again on how to check the stability of the tunnel formed by 2000mm steel casing which is pushed by pipe jacking approach in sandy clay. does it require to check SLS and ULS? and how to assess the...
hi bimr, thanks for the reference provided. The purpose of installation is for water pipe by segmental tunnel approach in urban area. Because of site constraints caused by traffic condition and congested underground installations, trench in phase is impossible to launch. Thus the segmental...
Hi all, I am doing research on the construction method of laying 900mm and 600mm pipe underground by segmental tunnel (maybe referred to hand dig tunnel) which is 2m x 2m x 30m tunnel at 6m depth (invert level). could you let me have your view on which main components should be considered when...