  1. olame

    What is "Soft I/O"?

    Thanks everyone for the replies. I get it now.
  2. olame

    What is "Soft I/O"?

    Please can someone explain the meaning of the term "Soft" I/O to me with respect to input and output of a Control system ?
  3. olame

    Estimating number of Marshalling and System cabinets

    Thanks Controlnovice for the reply, I agree all those issues you higlighted are critical for a good detailed estimate. But my question really is that is there a tool for an un-constrained estimate? sometimes at the very early stage of a project, you want to do an un-constrained estimate of...
  4. olame

    Estimating number of Marshalling and System cabinets

    Please does any one know any application or spreadsheet for quickly estimating the number of Marshalling and System cabinets required for a DCS control system- assuming the number of I/O s to be terminated are known ?
  5. olame

    Interlocking three on/off valves

    Many thanks Gerhard, To explain a little better: I already have two valves interlocked together with the attached schematic, but I want to add a third valve with a simple modification to the existing scheme. The condition remains that only one valve will be open at the same time. Note also...
  6. olame

    Interlocking three on/off valves

    Helpfull members, I want to interlock three on/off valves with a pneumatic 3/2 solenoid valve on each valve such that only one of the valve can open at a time. Can anybody propose a scheme for this?
  7. olame

    What does Ex"de" protection method really mean?

    Does anyone know what Ex"de" hazardous area equipment protection really mean?. Ex"d" means flame-proof while Ex"e" means increased-safety, these are based on two different principles hence I am a little confused on how the two can be combined together for the same equipment.