I've just had a thought that has prompted a question on a related topic: in designing the reservoir development strategy, will engineers generally decide first how many drill centres are required, and then figure out how many wells should be at each drill center? I'm sure it is a little more...
Hi. I am working on a project that requires me to have some understanding of subsea production systems (from Xmass tree to the risers) and what some of the key factors are that determine things such as the well placement, number of manifolds, manifold placement, etc. I have some knowledge of...
Thanks very much SJones, that information is very useful in giving me an idea of order-of-magnitude differences. Our client has shown interest in investigating this potential opportunity further, so they are pulling together the details required to progress this to the next step (i.e. technical...
Thanks for the response. I do understand that the details I have given are insufficient to do any decent analysis - obviously if there was a change in direction then a much more thorough analysis would be required.
I know that there are different types of CRAs, but roughly how much more would...
Thanks for the responses, they are very useful.
To give a little more context: I have a background in chemical engineering, however I am currently working as a management consultant for an O&G operator. Consequently, I am not necessarily trying to perform rigorous technical engineering...
Hi,
I am currently working on a project in which the default option is a pipeline with internal CRA lining. We believe that this option is excessively expensive, so are looking to recommend that a carbon steel pipeline be constructed instead. To answer this question I am looking for guidelines...