During tank refill the volume is the vapor displaced by filling rate and US Coast guard requires 125% of the maximum fill rate for the design. But in addition to the fill, there will be four other tanks empty and in breathing mode and we are required to vapor control those tanks in addition to...
We are building a tank farm with five 250k BBL internal floating roof tanks. Each tank has 50000 cubic feet vapor head space and will be landed on legs before being refilled. We will be required to install vapor destruction unit to control vapor head space during tank refill and when tank is...