Unfortunate, pro/e don't have a directlly link in this stage with ms-access. I use following method:
1. [Info]-> [Bill of materials]: Top Level (Instance) / File.
2. Import the result file in ms-excel using "Space" delimitator for colums.
3. Manage ms-excel file or import it in other...