I'm converting a HEC-2 effective model from FEMA for a CLOMR analysis and this one bridge is giving me a hard time.
The "open area" in HEC2 for pressure flow is basically the same as the open area of the bridge without the pier. The total pier width is 20ft and the total width of the opening is...