Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations GregLocock on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. RRRENG

    Outlet Control Structure Modelling

    Well, I ended up modelling the interior of the riser as a separate "pond" using the "Catch Basin" option. I think this should be sufficient to address the consultant's concerns. It made a minor difference in the actual results, but nothing at all of note. Thanks for the assistance.
  2. RRRENG

    Outlet Control Structure Modelling

    My question I guess then is, Does HYDROCAD take into account the entrance head requirements for the culvert?
  3. RRRENG

    Outlet Control Structure Modelling

    Hi All, This is my first post to this forum. I had a question. I have modelled a pond with an outlet control structure consisting of a low flow orifice (Flowing to Device 1) and sharp crested weir (Also flowing to Device 1) discharging to a culvert (Modelled as the Primary). The report states...

Part and Inventory Search