    Dozing production

    If I doze a heap of X cubic meters for 30 meters from A to B. I then doze the same material from B to C for 30 meters. If it takes me 1 hour to do all this job what is my production per hour? Is it X cubic meters or X times 2? why ? I am aware of factors that need to taken into account when...