Hi,
We heat a building with hot water pipe system and with Heating and Venting Air Ducts. Heat for both distribution systems, comes from 2 boilers 37 BHP each, each equipped with 2 stages burners, using oil #2. The peek fuel in cold winter condition is 24 USga/hr.
The required air for...