The vessel is 30' x 12'. What I asked is for information regarding means and methods for PWHT. The PWHT is going to be performed according to what we decide tommorow in the mentioned meeting. There is no pipe welded to the vessel accept for the nozzels. I doubt that taking the platform off would...
thread177-29735 I would appreciate any info. I can get on means and methods for post weld heat stress of A 212-B Carbon Steel 1962 Vessel. Vessel was use for Amine service and is now going to sour water with same design pressure of 390 PSI,although operating pressure will be only about 60 PSI...