I still don't have a valid option. I could revise the existing print to C and consider it as the new drawing for the new part. Although this will not work because it's possible that the old tool/part could still be revised or updated prior to the new tol being released. This could easily be...
I have a injection molded part with a part number that cannot change. Let's call it part ABC rev B. I'm currently having a new tool made for the same part. I don't want the existing vendor to know I'm second sourcing the product/part so I cannot add a chart or table to the existing print. Plus...