Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations GregLocock on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. wildpete

    Minimum PF Fineness required in 250 MW Tangential Fired Boiler

    DaveFitz, As far as I'm aware the burner to burner coal flow balance has not been checked since the sation was comissioned nearly 30 years ago. We have never replaced a Mill P.F. orifice but instead the fitters told me that they have turned the orifice plates upside down to extend their life...
  2. wildpete

    Minimum PF Fineness required in 250 MW Tangential Fired Boiler

    We give the ash away to a cement manufacturer and they do grumble on the odd occasion about the carbon in ash content. Unfortunately we are not ever likely to be able to sell it to them so I guess them taking it off our hands for nothing saves us about $75 ton in disposal costs. If its...
  3. wildpete

    Minimum PF Fineness required in 250 MW Tangential Fired Boiler

    On the surface there appears to be no problems but in my opinion we are not really looking very hard for them either. I spoke to the station chemist and it seems that he checks the cegrit samplers about once per week and we have two of them on each boiler located above the secondary air heaters...
  4. wildpete

    Minimum PF Fineness required in 250 MW Tangential Fired Boiler

    Hi, I have recently started as an asset engineer responsible for Mills,Fans,Air Heaters,Burners and ductwork etc at a thermal power station. This station predominantly burnt gas in the first 25 years of life so not much time and effort was put into keeping milling plant at its optimum. Thinks...

Part and Inventory Search