  1. REGRUMBLE

    GMAW Metal Cored Wire

    We use metal core extensively for several years without any more problems than other wires. Some metal core wires reqire flux core welders tickets if you are certified to CWB/AWS but require GMAW tickets if you are welding to ASME. What code are you working to and which metal core?
  2. REGRUMBLE

    Source of Cautionary Note in ASME Section II, Part C for E309 Filler Metal

    We still have a lot of engineers who will not accept 309 filler metal when the vessel is stress relived because of this note in the code. Even though it is not relevant in the past 20 yrs they still insist that we use ERNiCr-3 for dissimilar aloys when subject to PWHT. Engineers still work in...
  3. REGRUMBLE

    WPS

    weldtek Our procedures must be aproved by TSSA and as far as I know they have always taken the stace that because the consumable can exceed the limits imposed by SFA 5.18 the wire is not aproved. Do you specify in your procedure that the MTR for filler metal is inspected and aproved before use?
  4. REGRUMBLE

    WPS

    E70 S6 does not meet the chemical analysis of A1. E70 S2 or S3 do meet this requirment so there is considerable difference and sice a change in the A number is an essential variable you always need separate procedures for these two wires.
  5. REGRUMBLE

    Xray GMAW

    fegenbush The question was -is it acceptable to xray gmaw welds-- By every code the answer is yes short arc or not.
  6. REGRUMBLE

    Xray GMAW

    I realize you posted this in the AWS forum but we weld lots of ASME pressure vessels with GMAW that are 100% RT inspected. there is no reason why GMAW welds should fail an RT inspection.
  7. REGRUMBLE

    ASME "U" Stamp and NB registration

    NB registration is never needed in Canada - CRNs are always required and they are a lot more difficult and expnsive. As fegenbush points out you can NB register if you want.
  8. REGRUMBLE

    Welder Continuity

    QW322 only makes reference to process not base metal. If he welds GMAW process on anything he qualifies for all his GMAW tickets for the period.
  9. REGRUMBLE

    PQR and WPS software

    I do not have the years of experience that metengr has but when we started doing ASME procedures 5 yrs ago I researched several computer programs that claimed to write ASME welding procedures for you and none of them worked. By the time you adjust everything that you want to do so that the...
  10. REGRUMBLE

    Nitrogen filled vessel

    Thanks to all for the input. The pressure vessel is designed for full vacuum so that could be done but I do not believe it is necessary. They want the interior to be fully blasted and the nitrogen is only to prevent internal rusting during storage. They are suggesting that we insert nitrogen...
  11. REGRUMBLE

    Nitrogen filled vessel

    We have a large vessel that the engineer wants cleaned and shipped with 5 PSI nitrogen. Does anyone know of a procedure to purge and fill the vessel so that we can guarantee it contains nothing but pure nitrogen.
  12. REGRUMBLE

    Does shell thickness vary in ASME Sect VIII Div. 1 U-stamped Vessel ?

    If our cost was $1000 we would mark it up but at the same time we often build 2 or 3 vessels so that we can divide the cost. Our AI typically makes one visit for MTR's and drawings (initial) one visit for RT and Hydro and the last for paperwork. Often another visit for fit up if required on...
  13. REGRUMBLE

    Does shell thickness vary in ASME Sect VIII Div. 1 U-stamped Vessel ?

    The identical vessel with a "U" stamp will cost a small amount more but not two or three thousand more. Our AI generally makes 3 visits for the average vessel @ $150 each and a small amount of paperwork to register it with NB or CRN but in total it would be only $1000. But back to the original...
  14. REGRUMBLE

    Weld Symbol Clarification

    The weld symbol is a basic fillet weld so does not specify a filler metal but how else will you achieve the fillet size required. You cannot just melt the parent metal so you must add something.
  15. REGRUMBLE

    How to determine voltage for Holiday Test

    We have a shop Holiday procedure for polyethylene coating that reads: Dry film Mils Voltage 8 to 11 1,700 12 to 15 2,200 16 to 20 2,700 21 to 40 3,200 41 to 55 4,200 You first need to find out what the min required thickness is and set your Holiday tester accordingly. Note that...
  16. REGRUMBLE

    Is it a pressure vessel if it contains a solid instead of a liquid or gas?

    Lots of presses stamp out parts by compressing powders or pellets with thousands of pounds pressure in a die form without being a pressure vessel. I would think your chamber would be considered a form not a pressure vessel.But i am not an engineer :-)
  17. REGRUMBLE

    UT instead of RT

    Thanks stanweld it was exactly the code case I was looking for.
  18. REGRUMBLE

    ASME U1 Manufacturers Data sheet

    Look for a National Board number on the data plate if you are US or CRN number if you are in CANADA. These two organizations also keep records.
  19. REGRUMBLE

    UT instead of RT

    We are only certified to Div 1 so I do not have the Div 2 book to refer to. Do you know if there is a similar section in Div 1? The inspector has said as long as it is according to code he will agree but I do not have a clear answer for him. Phased array will cost more than RT for one 6" spot...
  20. REGRUMBLE

    UT instead of RT

    The code now allows for UT inspection instead of RT under UW 51 (4) . If I am building a vessel and the extent of examination is outlined as UW 52 for spot RT can i substitute spot UT?
Back