I need to design a recovery system for a new well to be added to an old pump and treat system. The new well needs to recovery 100 gpd of LNAPL from a depth of 100'.
The facility does not allow use pneumatic pumps with a downhole air supply. Piston pumps are acceptable, but only for total...
I am working on a piping design project that requires plastic lined carbon steel pipe. We are considering both kynar and HDPE linings, but will likely go with HDPE due to the lower cost. I need to bid the project out to at least three manufacturers and three installation contractors.