I thought of rock drains, but I'm space constrained behind the slide- I have a road on top of the slope.
If I do need piles, I'd pin it near the top, since that is what I want to keep. Maybe half-way down.
My first reaction was to pile rock on the toe of the slope and lay back the surface...