Thanks for the clarification, but I'm a little concerned about the sump dimensions and if that could affect somehow the construction of the foundation, or the settlement
I'm not too familiarized with the construction process, is the sump constructed during foundation or after foundation is done...
Greetings
We are designing a Fuel Oil Tank
ID= 220 ft
H= 64 ft
Roof: Structurally supported cone roof
Bottom: Apex up, 1:120 slope (center is higher than periphery)
We are having a problem with the tank drainage:
The client request the complete drain of Tank in case of maintenance: to...