Again thanks for the replies. Rust won't be a problem as it will be a mix of hydrocarbon liquids, MEG and corrosion (no free water) and our flare header and knock out drums are stainless steel. Our knock out drum also has a pumping system to reclaim liquids.
Firstly a big thank you for taking the time for reply to my original query. Obviously some differing approaches and sound justification for both stances. I think I will be pushing our pig receiver/pipeline EPC to design with a thermal relief valve included. While the stream is gas/multi phase...
Gents,
Thanks for the replies.
You are correct it does not have thermal relief as the designer has designed it like they would (i.e it is a pig receiver within a field) others they have designed. The problem it is in the middle of gas plant but it does have a tie in/blow down line to the...
Hopefully posted within the correct forum to get the most. Iews, replies and experiences.
I am currently working on a new build on-shore gas processing facility. As part of the build, a large pipeline transporting mainly clean gas with some liquids (c5+)is being attached. It is expected that...