A 10'x70' concrete driveway was poured at 60 degrees. True to Minnesota's weather, within 36 hours the air temp dropped to 20 deg. The driveway was left uncovered and the temperature of the concrete at 36 hours was 30 degrees and 27 degrees during the next 24 hours. A water hose on top of...