  1. may0511

    TANK NOZZLES ORIENTATIONS AND POSITIONS

    25362, the water is cold water and not warm water, but the project is to be executed in the equatorial region with high temperatures in some seasons. The 60 degees design temperature is for safety purposes.
  2. may0511

    TANK NOZZLES ORIENTATIONS AND POSITIONS

    Dear all, Please can anyone help me on this. I have been given a job by my company to produce drawings for a portable water storage tank. The nominal capacity is 1668m3. Design pressure is HYDR. barg. The design temperature is 65 degree celcius. I have also been given a P&ID showing the...
  3. may0511

    Piping Study

    Thanks all for the contributions. Actually the project is a new project in the FEED stage.Only the P&IDs have been given to me to develop the piping studies. I will welcome further contributions in this regard.
  4. may0511

    Piping Study

    Thanks BigInch. But is the organzation and presentation of the piping study going to be in written(text) or drawing format?
  5. may0511

    Piping Study

    Dear All, Please I need to know how to prepare a piping study. I have been asked to develop a utility piping studies for a project. How do I go about this?
  6. may0511

    AutoCAD to PDMS

    I have been using AutoCAD for Six(6) years now and wishes to go for a PDMS training. Please can anyone advise me if there are job prospects in PDMS. The training is expensive and I would like to have a Return On my Investment.