I'm working with a fairly large & complex 2.5 mile storm diversion pipe preliminary DESIGN project of twin 42" pipes with storm inlets placed every 300-400' along/above the twin interceptor. The twin interceptor is to be installed just above and parallel a very high stone quarry wall operation...